lucky you... is your roster days then nights or other way round?
malcolm ·
2 days 2 nights 5 off😁
blutopless2 ·
used to work that ages ago before they put us on days only.
miss the days off at the end of the shift block.. but only working 4 days a week now is cool too.
555bug ·
what do you do that has such strange hours?
66deluxe ·
Aviation? at a guess
Wild1 ·
24hr production of some sort?
blutopless2 ·
i think malcolm is an operator at a plastics plant in altona vic.
malcolm ·
sometimes 1day 2nights 5 off & 2days 1night 5 off, your right blutopless2:thumb
mackaymanx ·
Can't say I miss shift work, after 9 years underground on it. So glad I don't do it anymore.🙂
blutopless2 ·
malcolm wrote:your right blutopless2:thumb
thought i remembered it was you... i work at the Plastics site.
shaihulud ·
When I worked on international trunks 10 p.m. to 6 a.m. for the PMG in Melbourne in the 1960s we used to work 7 nights on, 2 days off, 7 nights on and 5 days off. I got a 5 day long weekend every 3 weeks. It was great.
On one days off two of us travelled from Melb. to the Snowy Mts. and back, via the coast in a bright red splitty kombi. Those were the days.
That was the time when I heard the music of the spheres during a waking dream on the beach at Malacoota.
PS I was not chemically modified by green vegetable matter at the time. LOL.
56astro ·
2 days, 2 nights, 4 days off.
I love shift work and would hate to go back to Mon-Fri. When all the kids are at school it will be like being semi-retired. 😂
malcolm ·
56astro it is ,it is :thumb
malcolm ·
blutopless2 did you work at the old Hoechst site.
blutopless2 ·
no... have worked at Resins site during one of the shutdowns a few years ago (for about 4 weeks) but never on a permanent basis... my brother used to work there as an Instrument Technician on one of the shifts many years ago.
i did my two apprenticeships at the Elastomers site and then transferred to plastics in 1998/9.
Am an Instrument Electrical Tech.
malcolm ·
now we,re owned by ChemChina
blutopless2 ·
yeah.. but it looks like they have some money to throw at us .... so that might be a positive
malcolm ·
as long as I can pay off the house,build the dub,finish my valve amps and I better finish painting the house
blutopless2 ·
lol... from the things we have heard they at least have a 10 year plan... that will do me.. enough time to finish off two beetles and pay off the house etc.... then i can retire and let mscabrio keep working... lol
blutopless2 ·
am off to watch the second half of the soccer.
c ya
mscabrio ·
blutopless2 wrote:lol... from the things we have heard they at least have a 10 year plan... that will do me.. enough time to finish off two beetles and pay off the house etc.... then i can retire and let mscabrio keep working... lol
PMSL ..... Highly doubt that sugar pie!
squizy ·
When I first started work used to do 1 week nights, 1 week evenings, 1 week days, then work 2 12 hr shifts after the dayshift, to then get a rostered week off, and come back on the Monday week for nights. It was amazing how much holidays I saved. I loved it. Evenings was my favourite - home by 1.....up at 8.....off to the beach all day....be at work for 4 - 12....summer was bliss.
malcolm ·
the old 8 hour roster ,8 days, 6off ,7 afternoons,4off,7nights& 4off thenyou had the doubles glad thats gone,luv the 12 hour shifts 35 hour week.
[ Edited on 16-8-2006 by malcolm ]
seagull ·
I do high quality plastic injection here as well .In saying this My factory is in Tiwan .