Hi Guys,
I am finally ready to replace the pan halves. I have trimmed to fit and am ready to weld in.
Any tips on fixing the pan halves in?
My present plan is to drill 3/16 holes in the panel periodically and then mig weld through the holes and build out to the pan (not that I have tried
this before - my forte is gas).
Cheers
Newt
yep do some check measurements on both sides to see if there even
clamp and weld if you can get a extra long set of vice grips to reach the tunnel or get a mate with a long heavy rod to push down on the panels
to get good contact