Its taken a long time to get this far, but I can finally see the light at the end of the tunnel.. thank god.... I was beginning to think
there wasn't an end at all !! Engine has been out & back in after the car was painted.. replaced the torque converter.. Having a removeable
fibreglass rear valance really makes engine removal a one person job...
Still a small bit of wiring to do, all the wires are there, all connectors soldered on and covered with shrinkwrap. There are a few extra switches
under the dash and extra dash lights , I still have the Tachometer & other gauges to install yet.. My accelerator pump doesn't work in My Carby,
another small job, but the engine starts & idles OK.. Electronic ignition to go in too. and Not forgetting the air conditioning to go in at the
end of the year.... and the windows & interior.
I have put the outer scraper & 1/4 window in the drivers door. The Left hand scraper turned out to be Brazillian Crap.. I had a spare from a
superbug I wrecked, it was Crap too... the clips broke off, and nothing was lining up....
Everything that could go wrong seems to have gone wrong with this car... But I still Love it.... thats the story so far...
Lee
ill be the first to say Lee ur car looks HOT man, well worth all the time and effort you have put into it, i can see now your colour choices are really going well together, that crazy red and yellow motor and awesome silver paint. u hav really come along way, congratulations. cant wait to see it cruising the streets, how long to go before we see this beauty?
With fingers crossed, I will be going to Valla - Nambucca but I'm hoping to have it finished before then...
Naturally I can't wait to be able to drive it on the road...
I think everything that can go wrong already has!!
So I'm on the downhill run now... I hope...
Wish Me Luck, as I haven't had any so far..
Thanks for the nice Comments...
Lee
looking smooth great job, its at this point im betting that your thanksfull u didnt take anysort cut and spent the time on it