modnrod Fahrvergnugen
978 posts · joined Mar 2011 ·
Oops.......
I have 2 sets of replacement floor pan halves. One is a cheapy crappy set when I thought all I was going to do was cut bits out and replace a few areas, one set is full length Klockenholm replacement panels after I'd had a better look.
Now I'm not a panel beater, but I can and do weld in panels, very slowly but they get done properly. I have to say though that I am completely underwhelmed with the replacement quality on offer.
Nearly all of my ACVWs over the years usually get extra flat panels either bolted or riveted in (for ally) or stitch welded in (for steel) over the stock pans, to give extra strength and impact resistance against my normal roads.
Here's a good one........
Here's one that gets regular maintenance, as you can see by the sign I pass weekly at least........
I've PMd "Smiley" for an opinion, coz he used 2.1mm checker plate very successfully on his Baja, but I thought I'd also put a thread up here for opinions and advice for everyone else to ponder over, so I'm hoping he doesn't mind and can add his experiences.
At present I'm leaning towards 1.55mm zincaneal flat sheet to replace the stock OEM "now-unobtainium" 0.9mm swaged panels, with the 2,1mm as a back-up. I'm after strength as a priority, the weight difference is only 20kg. Without the benefit of a 10 year engineering degree, I would consider (rightly or wrongly perhaps?) either option to be a strength upgrade.
Oh, and yes, it will need to be pitted when done, which means it's possible that cheap shitty unsafe stuff that looks stock might be preferable to new solid steel. I can't see any reason why new HD steel welded in would be subject to any different tech scrutiny than feeble aftermarket panels welded in, but I could be wrong (it happens a lot! 😂 ).
Engineers needed? Surely not for this?
Opinions? Experiences?