ricola Wolfsburg Wizard
437 posts · joined Feb 2003 ·
Just a quick summary of my project so far and my current plans!
Before it came off the road:
I had fitted 996 brakes on all corners and also kerscher front struts with the cup 2 wheels
I then found some serious rust so it was off the road for a BIG overhaul!
Inside the heater channels, same both sides!
I am also using a short nose G50 transmission
It has only done about 30k km and I also have an LSD to go in it.
Engine will be a WRX RA with VOS chip so about 300bhp, I had it in the car temporarily on the bug AT transmission before I decided to go G50:
I was originally thinking about modifying the dash for the subaru instruments, but now I am considering using the complete subaru dashboard complete with heating and air conditioning, also moving the steering column so it is less off-centre
I also have some 996 turbo sports seats:
Rust!
Rear strengthening panels removed:
There are a LOT of spot welds on this car!
I made up a removable frame to add extra body support while the heater channels were cut out
New channels and strengtheners after being stripped and repainted
New A post bottoms on both sides
New crossmembers
New bulkhead
Inner wing strengthening was also rusty...
New inner wing
For ALL the pictures have a look here: http://www.ricola.co.uk/cabrio_rust.htm
The bulk of the body repair is now done :cheers:
Now for squeezing in the G50...
I have positioned it 25mm higher and about 70mm forwards compared to the standard bug trans to get the subaru engine under the bodywork.
I'm now buildingup something along the lines of the sketch below, made out of 40x60mm tube, that way I can make them suitable for the subaru engine mounts. I am making the new floor perimeter from the same tube so will tie it all in together, I think it will be nice and strong when I'm finished.
Latest progress:
New brackets for the 911 front mount:
Getting the shape for the top of the new framehorns
No going back now!
The splines remade to fit further out inside the torsion tube, I'm using shorter swing axle torsion bars now
All welded in!
More progress during the next week or so, a full 4 days next weekend!