dlwrede Learner Dubber
11 posts · joined Aug 2007 ·
Anyone have an idea on cost for a full rebuild on a 2.0lt T4 motor.
I have been given a estimate of $4200 for the following:
New heads inc heavy duty valve springs and valves (larger inlet & exhaust ports), new standard barrels & pistons for the top end. New cam (270/290 duration with 0.420 lift), lifters and full set of bearings throughout the bottom. It was described as a total rebuild.
Does this sound fair??
Cheers
Derek