Hi Guys,
I am fitting 2 new fuel lines down the inside of the tunnel.
I will secure the new lines aroung the pedal area and also at the rear (where you can get you hand into the tunnel).
Has any one secured the lines mid way down the tunnel?
Cheers
Newt
It is as it is - If you didnt enjoy today, you've missed the opportunity.
Mate,
As you can imagine it's a bit difficult. Best thing I can think of is one of those dual line clamps that you could use a magnetic pick up tool to poke down the gear lever hole and then a bolt coming from the outside of the tunnel that screws into the threaded mounting hole of the dual line clamp. Tricky but possible 🙂
madness is in the eye of the beholder 👍