Thank you for the kind words 😀bevelhead wrote:Great ongoing build mate, i enjoy seeing your engineering solutions every month or so when i check back on progress 🙂
Got a little bit done in the last few days.
Got to work mounting up the dual handle cutting brakes. I cut the front of the mount frame off and left it bolded to the arm pivot. And then put everything in place on the pan so I could work out how it's going to fit.
Made up some mounting plates for the cylinders which will be welded o the tunnel.
Next up I dug out the handbrake that I will be using to check clearances. Going to be tight. I had to move the cutting handles forward a touch on the tunnel and notch the underside of the handbrake out a bit. But it all fits and the handbrake works like normal. You can see I will have to trim the handles back a little as the left side one doesn't clear the gearstick anymore with them moved forward on the tunnel.
And here is everything in place and welded up. I made some extended pushrods by welding a pair of nuts onto the head of some bolts I got to suit the length. The fit is all very good and All the handles work as they should. I'm thinking I might cut the handbrake length down a bit to give more room to grab the ends of the cutting handles.
Next up flip the pan over again so we can finally get onto mounting the stuff in the tunnel.
I started from the back and worked forward. Welding in the stauff clamps for the aircon lines first up.
Once we got up under the pedals I cleaned everything up and added a few strengthening plates across the seam where I welded the framehead on. Should be super strong now! Then the lines could be looped around the pedals. I cut the hook off the clutch pedal to give some more room, and stop it rubbing on the hoses.
I also added a doubler plate on the framehead where the bulkhead fittings are coming through.
Then I welded the plates to the other side of the tunnel for the oil hoses. And the smaller ones below this for the fuel hardline.
I ordered some sexy AN fittings for the fuel hardlines. I drilled the lift kit at the back for the bulkheads. Sorry about the shoddy picture, the pan was still upside down. You can still get an idea of where they exit out the back.
Last thing I got down was to drill holes along the tunnel and weld nuts onto the inside. These are for the clamps that will hold my brake and clutch hardlines in place. The brake is on the right of the tunnel and the clutch down the left. You can see the spots along the tunnel where I buffed the paint off. I need to get some shorter bolts though, cause the ones I have stick into the tunnel too far where some of the hoses are going to be.
I also discover that my floorpan can stand up all by itself, even with the gearbox bolted into it 😀
Things are getting a little busy up the back here. I still have to add a new accelerator cable tube too. But I am confident that everything will fit! I still need to work out some way of sealing the shift linkage to the floorpan where it comes through the lift. Does anyone have any good ideas for this??
Lastly, I bought a new second battery for the car. This one will be dedicated to running the fridge and camp lights. Whereas the other will be for most everything else.
Still a few things I need to do in the tunnel before I paint it up and weld it shut again. Mostly fitting the front bulkheads fittings and making up the oil hoses and fuel lines. And adding the new accelerator tube. In addition to this I have picked up my rear guards which have been repaired, as well as the engine scoop. The front guards that I had widened turned out to be rubbish So I have taken another set to a different guy that has been doing my glasswork and he is widening them for me again.
Still heaps to do but things are falling into place slowly.
Thanks for looking.
Smiley 🙂