price of concrete per m3

0 likes
Share Share on Facebook Share on X Share on Reddit
Log in to reply

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837264
anyone know a rough current price for concrete per m3 ?

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

Kuchster Insano Dub Head

762 posts · joined Sep 2003 ·

#837265
Starts at around $160 for a concreter, you wont find much cheaper, unless they buy a lot more but im not sure how much more it would drop by. Some pay $180 or $190
Kuch's Laser Cut Products
http://www.kuch.com.au/laser

11CAB If ya got it....Baja it

4,674 posts · joined Aug 2002 ·

#837298
I just got a 6x6 slab put in for about $2600 for my shed
65 Meyers Manx
68 Country Buggy (KO 367)
68 Country Buggy (KO 669)
68 Country Buggy (KO 789)
68 Country Buggy (KO 815)
68 Baja Bug
76 Baja Kombi Twincab

ahoogah Seriously Crusin Dubber

135 posts · joined Oct 2009 ·

#837308
Depends on the strength you need,mix design, the distance from the batch plant and volume.
Minimum cartage rate of 3m.
Mini mix dearer.
Ring around for best price,everyone is keen atm.

whathaveidone Custom Title Time!

1,559 posts · joined Feb 2010 ·

#837310
11CAB wrote:I just got a 6x6 slab put in for about $2600 for my shed
Hope that was 6mX6m??????Otherwise if ill do your next one if you want

11CAB If ya got it....Baja it

4,674 posts · joined Aug 2002 ·

#837314
Yeah 6m x 6m
65 Meyers Manx
68 Country Buggy (KO 367)
68 Country Buggy (KO 669)
68 Country Buggy (KO 789)
68 Country Buggy (KO 815)
68 Baja Bug
76 Baja Kombi Twincab

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837321
ok so lets say average $175 per m3.

ok 18 x 10 ummm 5 inch? I wont be driving any heavy vehicles.

so where was I? oh yeah 18 x 10 x 0.127 = 22.86m3 = $4k just for concrete

x 2 the price for reo, plastic and labor only the concreting itself. My team and I will be doing the digging, leveling, compacting, plastic, foam separators etc...

yeah 8k is doable. My half bro does sheds and has been doing for well over 20 year, he actually built my shed. Got some friends of his who do concreting for a living which will join the project
at a mates rate 😂 dam I feel cheap. My half bros idea I swear!

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

ahoogah Seriously Crusin Dubber

135 posts · joined Oct 2009 ·

#837338
Always a good idea to get the subgrade checked by the floorlayer before reo goes down,nothing worse than lack of cover.
Plenty of excellent floorlayers about will work for collin ash.
At 180m/2 you will need a few men,may need to factor in a concrete pump depending how solid the ground is.

mactaylor Custom Title Time!

1,005 posts · joined Aug 2007 ·

#837340
going rate around albury for crete about $180m3 place and finnish $22-$35 per m2 no earth works. its a good time of the year to get helpers in as theres not much on, concrete pump costs bout $130 an hour minimum 3 hrs $5m3 wear charge and $3 a klm.
EVERLAST CONCRETE TANKS
1800 552 123

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837354
ahoogah wrote:Always a good idea to get the subgrade checked by the floorlayer before reo goes down,nothing worse than lack of cover.
Plenty of excellent floorlayers about will work for collin ash.
At 180m/2 you will need a few men,may need to factor in a concrete pump depending how solid the ground is.
yeah we got all that factored in. I got a budget of 9-9.5K for the project. The concreting mates we have, have got all the equipment and helicopter.

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

Adsman Officially Full-On Dubber

393 posts · joined Jan 2007 ·

#837390
hmmm great to be in the know

Got mine done nearly three years ago but keeping in mind i lived in north qld and everything is more expensive
12 x 18 bonded beam slab reinforced in roller door bays with 2m cubic hoist reinforcing beam = 30odd metres of concrete, cost $185 a metre plus milage surcharge, helicopter finished, 6 workers and bobcat hired $24k job in 8hours kinda makes you feel sick when you look at it that way
never the less love the concrete floor good jobs cost money
probably should add that it was increased hardness concrete and had slower cure additive put in to reduce cracking
What my garage isn't messy........Well chaos is a form of order isn't it?

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837398
f**king hell! that expensive as hell 🤪

We have man power with several people, which only 1 or 2 are being hired at a mates rate anyway. My half bro has a vibrating roller, excavator, normal vibrator plate.

He also can get all the GST back for me as heel can put it under his business. So we estimated 8.5k with extra 500-1000 buks in case whatever and this was estimated on a 20 x 15 slab
so when i measured it and got 18 x 10, realistically we got 7-8k but I have 9-9.5k anyway.

I wont be doing it in 8 hrs. the preparation will be a week or 2.

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

matberry Moderator Go hard or go home

8,114 posts · joined Mar 2006 ·

#837412
Amazing how it pays to get quotes. 5 years ago now, building house and shed at the same time, shed is 12 x 18, house slab similar area, quotes varied from 20k to over 40k. I got both and another for water tanks with uprated concrete for about 24 all done.
Matt Berry Motorsports...air cooled advice, repairs and mods Ph 0408 704 662
OFF-ROAD,CIRCUIT,DRAG,STREET,ENDURANCE

Adsman Officially Full-On Dubber

393 posts · joined Jan 2007 ·

#837519
lol you can add another 10-14k on that price for other quotes. Gee I love north QLD.....
What my garage isn't messy........Well chaos is a form of order isn't it?

mactaylor Custom Title Time!

1,005 posts · joined Aug 2007 ·

#837573
yeah quotes are varied but the top end dudes all seem to hang around the same usually bout $65 m2 all up but this can vary as the site and soil changes and who the quote is for, double it if its for a teacher or triple for a university lecturer!
EVERLAST CONCRETE TANKS
1800 552 123

volumex Officially Full-On Dubber

389 posts · joined Jul 2005 ·

#837588
vlad01 wrote:ok 18 x 10 ummm 5 inch? I wont be driving any heavy vehicles.
I'll talk to some of the civil engineers at work and see how thick it needs to be.
Is it just for working on cars? Any plans for hoists or jib cranes etc?

ahoogah Seriously Crusin Dubber

135 posts · joined Oct 2009 ·

#837592
volumex wrote:
vlad01 wrote:ok 18 x 10 ummm 5 inch? I wont be driving any heavy vehicles.
I'll talk to some of the civil engineers at work and see how thick it needs to be.
Is it just for working on cars? Any plans for hoists or jib cranes etc?
The nine words that construction coalface personnel do not want to hear?
"I am an engineer,I am here to help" 🤓

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837611
I have been recommended I should only need 3-4". 🙄 yeah right, so i talked to my half bro who was and engineer for over 30 years and did sheds on the side and still does.

He recommended 5" he has 6" in his 2 sheds which has a massive fork and 10 ton truck and few 10 ton lathes and he even used to have a 35 ton lathe.

No problems at all. its all in the base preparation. hell I could go 6" for extra 500 buks.

I may have a hoist one day? possibly a small fork? for what I don't know. Yeah the shed will only be for cars. I do plan for a gantry system but that's nothing to do with the slab.

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

BiX Veteran Volks Folk

2,499 posts · joined Sep 2002 ·

#837717
Your brother is right, subgrade is the key. Its almost like body work, the prep really makes the finished product. 100mm is not out of the question for a light weight slab.
I have no sympathy for my car, only the wallet that pays for it!
Go hard or go home!!!!

beetleboyjeff Custom Title Time!

1,790 posts · joined Feb 2009 ·

#837720
BiX wrote:100mm is not out of the question for a light weight slab.
As a builder, I would agree with this, and the preparation statement. You could even just thicken the slab where you may want a hoist later, or strengthen the slab with beams in it. You may well need beams around the edges, depending on what type of construction your shed will be.

Interestingly on the concrete price, we were paying almost $200 m3 for 25mgp concrete in Port Macquarie over 12 months ago, and I just got a quote in Parkes, and it was just over $ 200 m3 for 20mgp concrete. Maybe just check with your local supplier for their current price - should only need a phone call.
From your ole' mate Jeff

waltermitty Legend when my beer goggles are on

1,993 posts · joined Aug 2002 ·

#837726
vlad01 wrote:ok so lets say average $175 per m3.

ok 18 x 10 ummm 5 inch? I wont be driving any heavy vehicles.

so where was I? oh yeah 18 x 10 x 0.127 = 22.86m3 = $4k just for concrete

x 2 the price for reo, plastic and labor only the concreting itself. My team and I will be doing the digging, leveling, compacting, plastic, foam separators etc...

yeah 8k is doable. My half bro does sheds and has been doing for well over 20 year, he actually built my shed. Got some friends of his who do concreting for a living which will join the project
at a mates rate 😂 dam I feel cheap. My half bros idea I swear!
Your budget is missing BEER all concreters drink their weight in beer immediately the job is screed. I believe the rate increases for mate rates. M
23 windows ...8 too many!

HappyDaze Superannuated

2,887 posts · joined Jun 2009 ·

#837729
It surprises me that no-one has mentioned the importance of STEEL in all of this. Without reo., concrete is not much good - no matter how thick!
I'd rather wear a Beetle out by racing it than by polishing it!

silver Dangerous when poked

2,169 posts · joined Dec 2002 ·

#837730
and an edge beam with steel as well
Keeping it real !

norbert Comedian in training

317 posts · joined Jan 2009 ·

#837731
9-10 grand even with mates rates is cheap. I paid 26 grand 26 years ago doing my house slab which is 210 m2. Granted its near Canberra and Pub rates apply even if your not one of them.
Jetzt mache ich meinen Karmann und Käfer zusammen.

ahoogah Seriously Crusin Dubber

135 posts · joined Oct 2009 ·

#837734
HappyDaze wrote:It surprises me that no-one has mentioned the importance of STEEL in all of this. Without reo., concrete is not much good - no matter how thick!
Reo doesn't give any more strength on ground slabs,just holds the concrete together if it cracks.
Adequately solid subgrade is more important.

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837819
waltermitty wrote:
vlad01 wrote:ok so lets say average $175 per m3.

ok 18 x 10 ummm 5 inch? I wont be driving any heavy vehicles.

so where was I? oh yeah 18 x 10 x 0.127 = 22.86m3 = $4k just for concrete

x 2 the price for reo, plastic and labor only the concreting itself. My team and I will be doing the digging, leveling, compacting, plastic, foam separators etc...

yeah 8k is doable. My half bro does sheds and has been doing for well over 20 year, he actually built my shed. Got some friends of his who do concreting for a living which will join the project
at a mates rate 😂 dam I feel cheap. My half bros idea I swear!
Your budget is missing BEER all concreters drink their weight in beer immediately the job is screed. I believe the rate increases for mate rates. M
is 200 buks in beer good? lol. I wouldn't know I don't drink.

Oh yeah talked to me half bro agian, he has 5" in the shed that used to have the 40 ton lathe and the fork. No probs. So 5" it is. 👍

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837820
norbert wrote:9-10 grand even with mates rates is cheap. I paid 26 grand 26 years ago doing my house slab which is 210 m2. Granted its near Canberra and Pub rates apply even if your not one of them.

I told my bro about the prices mentioned here in this thread.

he has never heard of such high prices before. must be the labor in preparation? i guess you don't pay yourself for the work you do yourself.

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

vlad01 Compulsive Aussie Vee Dubber

4,270 posts · joined Jun 2010 ·

#837825
ahoogah wrote:
HappyDaze wrote:It surprises me that no-one has mentioned the importance of STEEL in all of this. Without reo., concrete is not much good - no matter how thick!
Reo doesn't give any more strength on ground slabs,just holds the concrete together if it cracks.
Adequately solid subgrade is more important.
yeah that is already factored in. will be around 2400 buks including delivery. That is the first thing i am buying.

71 notchback,
Past owner of, 70 NB, 73 SB and 72 FB TLE

mactaylor Custom Title Time!

1,005 posts · joined Aug 2007 ·

#837892
as mentioned steel is only for crack control in a ground slab, however i did a slab afew years back that was 350mm thick top and bottom sl101 mesh for a forge around here that supports 40 tonne manipulator that picks up red hot 15 tonne billets and on occasion drops them! so far so good!
EVERLAST CONCRETE TANKS
1800 552 123

donn Wolfsburg Elder

3,515 posts · joined Nov 2005 ·

#837967
Of course reo is for crack controll, concreye is good in compression but rat shit in tension, if your ground moves then the top of the slab will be either in compresion or tension and the bottom of the slab will be in the opposite situation, delete reo in slab on ground at your own risk. Hear endeth the lesson.
I dream of a day when a chicken can cross a road without being asked for it's motive!